Boulder Canyon Project

Effective October 1, 2025

Schedule Description Rates
BCP-F11 (PDF) Electric Service
Base Charge $76,174,568
Energy Dollars $38,087,284
Capacity Dollars $38,087,284
Forecast Energy Rate1 12.95 mills/kWh
Forecast Capacity Rate2 $2.27 /kW-month
Composite 25.89 mills/kWh
Lower Colorado River Basin Development Fund 4.50 mills/kWh (AZ)
Contribution Charge 2.50 mills/kWh (CA/NV)
1 Applied to Excess Energy, Unauthorized Overruns, and Water Pump Energy.
2 Applied to Unauthorized Overruns.

Point of Contact: Christina Maldonado


 

Parker-Davis Project

Effective October 1, 2025

Schedule Description Rates
PD-F8 (PDF) Firm Electric Service
Energy Charge 14.14 mills/kWh
Capacity Charge $6.20 kW-Month
Composite 28.27 mills/kWh
Lower Colorado River Basin Development Fund 4.50 mills/kWh (AZ)
Contribution Charge 2.50 mills/kWh (CA/NV)
DSW-FCT8 (PDF) Transmission Service of SLCA/IP Power $1.76 /kW-Month

Point of Contact: Shannon Joya


 

One Transmission Rate (OTR)

Central Arizona, ED5-PVH, Intertie, & Parker-Davis Projects

Effective October 1, 2025

Schedule Description Rates
DSW-FT1 (PDF) Long-Term and Short-Term Firm Point-to-Point Transmission Service (Schedule 7 to OATT) $21.12 /kW-Year
$1.76 /kW-Month
$0.41 /kW-Week
$0.06 /kW-Day
2.41 mills/kWh
DSW-NFT1 (PDF) Nonfirm Transmission Service
(Schedule 8 to OATT)
2.41 mills/kWh
DSW-NTS1 (PDF) Network Integration Transmission Service Annual Transmission Revenue Requirement (Attachment H to OATT) $107,004,624

Point of Contact: Tina Ramsey


 

Other Services

Effective October 1, 2025

Western Area Lower Colorado (WALC) Balancing Authority Area Services

Schedule Description Rates
DSW-SD4 (PDF) Scheduling, System Control & Dispatch
(Schedule 1 to OATT)
$12.54 /schedule per day
DSW-RS4 (PDF) Reactive Supply and Voltage Control
(Schedule 2 to OATT)
$0.096 /kW-Month
DSW-FR4 (PDF) Regulation and Frequency Response
(Schedule 3 to OATT)
$0.103 /kW-Month
DSW-SPR4 (PDF) Spinning Reserves
(Schedule 5 to OATT)
None available1
DSW-SUR4 (PDF) Supplemental Reserves
(Schedule 6 to OATT)
DSW-EI4 (PDF) Energy Imbalance
Schedule 4 to OATT
See Rate Schedules2
DSW-GI2 (PDF) Generator Imbalance
Schedule 9T to OATT

Transmission Provider Services

Schedule Description Rates
DSW-TL1 (PDF) Transmission Losses 3.00%
DSW-UUI (PDF) Unreserved Use Penalties
Schedule 10 to OATT
See Rate Schedule

Western Energy Imbalance Market

Schedule Description Rates
DSW-EIM1T (PDF) Administrative Service
(Schedule 1T to OATT)
Pass Through3
DSW-EIM4T (PDF) Energy Imbalance Service
(Schedule 4T to OATT)
DSW-EIM9T (PDF) Generator Imbalance Service
(Schedule 9T to OATT)
1 Upon request, WALC will purchase at market price and pass-through the cost-plus administrative fee.
2 These apply if the Western Energy Imbalance Market (WEIM) is not operating and WALC is providing the service.
3 Charges shall reflect the pass-through of all applicable costs associated with WALC participation in the WEIM.

Point of Contact: Tina Ramsey