Document and Meeting Handouts
- Customer Meetings and Rate Adjustment Schedule For Long-Term Solution
- GC Lake Elevations Graph (PDF) – 8/2003 Hydrology Study
- Generation Forecast Graph (PDF) – 8/2003 Hydrology Study
- Power Projections Table – Original Proposal handed out at (PDF) 6/10/2003 Rates Meeting
- Power Projections Table – WAPA’s Lowered SHP Energy (PDF) (5351 GWh) Proposal
- Explanation of Tables Handed out at (PDF) 9/2/2003 Operations Meeting
Customer Comment, Questions and Analysis
- CAMU Letter To WAPA re: CRSP Solution (PDF)
- CREDA Working Group Recommendation (PDF), 10/03/03
- Power Projections Table – Average Allocation with a 5-year step-up (PDF)
- Power Projections Table – Median Allocation with a 10-year step-up (PDF)
- Power Projections Table – Median Allocation with a 5-year step-up (PDF)
- Table Showing Rate Impact of the above Power Projection Options (PDF)
- Contact Information
Power Allocation
Last modified on September 17th, 2024