Desert Southwest Categorical Exclusions (CX)
2024
- Apache GT5 & GT6 Generation Project (PDF)
- APS Sundance Project (PDF)
- Gila 34.5-kV Switchyard Rebuild Project (PDF)
- Pinal Central to ED5 Transmission Line Upgrade Project (PDF)
- Gila-Knob 161-kV Transmission Line Rebuild Project (PDF)
- Post 2028 Parker-Davis Project Marketing Initiative (PDF)
- Longroad Energy Serrano 230-kV Overcrossing (PDF)
- GRICUA 20 MW Load Relocation Project (PDF)
2023
- Access Easement Acquisition for TUC-DLB 115-kV Transmission Line (PDF)
- Rate Order WAPA-209 (PDF)
- Rate Order WAPA-210 (PDF)
- 337-Sonora-Wellfield-CE (PDF)
- Gila 69-kV Switchyard Rebuild Project (PDF)
- Pinnacle Peak to Rogers 230-kV Transmission Line Rebuild Project (PDF)
- Spook Hill Substation Decommissioning – Phase 2 Amended (PDF) (1/25/2023)
- DSW Mead Substation Entry Gate (PDF) (1-10-2023)
- Proposed Rates for Energy Imbalance Markets Services – Rate Order WAPA-208 (PDF) (12/15/2022)
2022
2021
- Exploration of Energy Imbalance Market
2020
- Access Road and Maintenance Pad Reclamation along the Davis to Topock 1 & 2, Topock to North Havasu, and Topock to Black Mesa 230-kV Transmission Lines in Arizona (PDF) (6-11-2020)
- Access Road and Maintenance Pad Reclamation along the Harcuvar to Little Harquahala 115-kV and Harcurvar to Bouse Hills 115-kV Transmission Lines (PDF) (3-30-2020)
- Access Road Repairs at the Flagstaff Substation (PDF) (7-7-2020)
- Flagstaff to Pinnacle Peak #1 & 2 Transmission Lines Herbicide Follow-up Application (PDF) (5-4-2020)
- Flagstaff to Pinnacle Peak #2 345-kV Transmission Line Frayed Conductor Repairs (PDF) (3-13-2020)
- Glen Canyon to Flagstaff #1 Insulator Replacement (PDF) (8-26-2020)
- Golden Eagle Artificial Nest Construction and Relocation of an Existing Nest on the Peacock to Prescott 230-kV Transmission Line (PDF) (3-13-2020)
- GridLiance’s Mead-Pahrump Transmission Line Rebuild Project (PDF) (1-17-2020)
- Herbicide Application at the Phoenix Area Office (PDF) (5-13-2020)
- Mead-Perkins and Peacock-Liberty ROW Herbicide Follow-Up (PDF) (4-10-2020)
- Mesa Substation Excess Property Reporting to GSA (PDF) (7-10-2020)
- Navajo-Long House Valley 230-kV Right-of-Way Integrated Vegetation Management (PDF) (6-15-2020)
- Phoenix Area Office Guard Building Replacement (PDF) (2-10-2020)
CX Archive
Last modified on December 18th, 2024