DSW Categorical Exclusions (CX) Archive

2019

2018

2017

2016

2015

2014

2013

  • Ad​ams Tap MOI and Control Building Replacement (9-11-13)
  • Casa Grande Substation, CAG 262 Breaker Replacement (4-4-13)
  • COLORA – Cross-Arm Replacement, Structure Nos. 12-3, 12-6 (9-23-13)
  • Davis Dam to Kingman Tap 69-kV Transmission Line, Overhead Optical Power Ground Wire Installation (5-16-13)
  • Davis Dam to MEC Kingman Tap 69-kV Transmission Line Rebuild (3-20-13)
  • Davis-Parker 230kV Transmission Line – Marker Ball(s) Replacement (12-17-13)
  • DSWR – Bi-Annual “Live Line” Maintenance Training (10-08-13)
  • Electrical District 2 to Saguaro #2 115-kV Transmission Line Access Road Maintenance between Structure 26/8 and 26/9 (5-20-13)
  • Gila Substation Emergency Current Transformer Replacement (4-26-13)
  • 3 Yuma Area Transmission Lines Emergency Storm Damage Repairs (8-26-2013)
  • GCS Switchyard – 230-kV Wavetrap Removal – TZ9A2 on the Navajo Line (6-21-13)
  • Gila Knob Transmission Line Crossarm Replacement at Structure 18/3 (06-03-2013)
  • Gila Knob Transmission Line Hot Crossarm Changeout Training (12-16-2013)
  • Gila-Wellton Mohawk Transmission Line Maintenance (1-3-13)
  • Glen Canyon Substation Stage 09- 50MVA 230/69kV Transformer Addition (7-2-13)
  • Glen Canyon to Flagstaff #2 345-kV Transmission Line, Access Road Maintenance from Structure 45/4 to 46/1 (8-8-13)
  • Henderson Mead #2 Erosion Control Project Near Structure 2/4 (9-11-13)
  • 40 Arizona Substations Herbicide Application (7-1-13)
  • 4 Southern California Substations Herbicide Application (7-1-13)
  • 1 Gila River Indian Community Substation Herbicide Application (7-1-13)
  • 2 Navajo Nation Substations Herbicide Application (7-1-13)
  • 4 Southern Nevada Substations Herbicide Application (7-1-13)
  • 36 Substations in AZ & CA Herbicide Application during FY2013 (4-19-13)
  • Lone Butte Substation located on the Gila River Indian Community, AZ during FY2013 Herbicide Application (4-24-13)
  • Hoover-Mead #1 and #5 230-kV and Mead-Marketplace 500-kV Transmission Lines Facilities Ratings Project (3-20-13)
  • Hoover-Mead #8 230-kV Transmission Line Insulator Repair Project (3-11-13)
  • Oracle Electrical Substation Installation of Cattle Guard (5-9-13)
  • Liberty-Parker Dam #2 230-kV Transmission Line, Optical Power Ground Wire Repair (08-22-2013)
  • LIBPAD-1 230 kV Transmission Line “Live Line” Maintenance Training at Structure 112-4 (10-25-2013)
  • Liberty Substation Transformer Replacement Project, Maricopa County, Arizona (06-06-2013)
  • Electrical District 5 Substation Project Material Source Site (2-28-13)
  • Mead KU2A Emergency Bushing Replacement (7-2-13)
  • Nogales Substation Temporary Laydown Yard (3/28/13)
  • Oracle Substation – Breaker Support Work (10-30-13)
  • Oracle to Tucson 115-kV Transmission Line, Cross Arm Replacements at Structures 2/5 and 7/3 (5-2-13)
  • Parker Dam to Gila 161-kV Transmission Line, Cross Arm Replacement at Structure 0/7 (7-22-13)
  • Parker Dam to Headgate Rock and Parker Dam to Bouse 161-kV Transmission Lines, Cross Arm Repairs and Helicopter Staging Areas Project (2-19-13)
  • Parker-Gila 161-kV Transmission Line Maintenance Project, Structure 92/1 to 94/9 (6-5-13)
  • Parker-Gila 161-kV Transmission Line – Structure 109-8 Relocation (12-18-13)
  • Parker Substation 161-kV 2013 Breaker Replacement (5-17-13)
  • 44 Substations in Arizona, California, and Nevada Pest Control within Buildings (6-6-13)
  • Phoenix to Lone Butte 230-kV Transmission Line, Bird Diverter Installation (4-8-13)
  • PHX-LOB and LIB-LOB 230-kV double-circuit – replace insulators at Structure No. 28-2 with NCI type polymers (8-12-13)
  • Pinnacle Peak – Rogers 230-kV Double Inset Structure #5/1a Installation (6-28-13)
  • Prescott to Peacock 230-kV Transmission Line Hazard Tree Removal between Structures 54/1 and 107/1 (11-22-2013)
  • Protection and Communication Facilities Maintenance (11-8-13)
  • Oracle Breakers 562 and 762 Removal and Replacement along with Associated Disconnects (7-2-13)
  • Saguaro-Tucson 115-kV Transmission Line Road Maintenance and Brushwork (4-30-13)
  • Saguaro-Tucson 115-kV Transmission Line, Structure Replacement at 10-4 (12-3-13)
  • Tucson Apache Emergency Structure Stabilization Project (9-6-13)
  • Tucson to Apache 115-kV Transmission Line Wood Pole Replacement Project (2-28-13)

2012

2011