Replacement Resource Process
WAPA’s Replacement Resource Process was a result of the Grand Canyon Protection Act of 1992, which authorized the Department of Energy to identify economically and technically feasible methods of replacing lost generation at Glen Canyon Dam, and to prepare a report by two years after the implementation of permanent changes in operations at Glen Canyon. The following documents are a part of the Replacement Resources Process:
——————————————————————————–
Final Methods Report and Executive Summary, March 1998
Printed copies of the Final Methods Report, Executive Summary, and Draft Methods Report are available by telephone, mail, or e-mail through the CRSP MC Office. The links below point to the text of the Final Report, however, note that some items referenced in Appendix A are not included.
Chapter 1, Introduction
Chapter 2, Background
Chapter 3, Policy Issues and Assumptions
Chapter 4, Resource Acquisition Process
Chapter 5, Proof-of-Concept Analysis
Chapter 5, System Topology Map
Chapter 6, Proof-of-Concept Results
Chapter 7, Conclusions and Recommendations
Appendix A, Key Documents
Appendix B, Document and Methodology Review
Appendix C, References
Last modified on September 16th, 2024