Next Gen Project
Basin Electric Power Cooperative proposes to construct a 500- to 700-megawatt baseload generation facility to help meet the increased demand for electric power in the eastern portion of Basin Electric’s nine-state service area. Four preliminary location alternatives (400 KB image) for the generation facility are being considered: two in the Selby, South Dakota area and two in the Pierre, South Dakota area.
Additional associated facilities include 230/345-kV transmission lines, a 36-inch to 42-inch water pipeline, and a water intake structure along Lake Oahe on the Missouri River.
Basin Electric has applied to interconnect the proposed Project to WAPA’s electric power transmission system. WAPA will prepare an Environmental Impact Statement to address the construction and operation of the proposed Project.
Project Updates and Documents
-
Federal Register Notice of Intent to prepare an Environmental Impact Statement, July 2007 (PDF)
- Landowner notification (PDF)
- NEPA process time line (PDF)
- Project timetable (PDF)
- Scoping meeting announcement mailer, August 2007 (PDF)
- Scoping meeting announcement newspaper ad, August 2007 (PDF)
Maps
- Map of Broadland – Storia Transmission Alternatives – 11×17 (North) (PDF)
- Map of Broadland – Storia Transmission Alternatives – 11×17 (South) (PDF)
- Map of Pierre Area Project Alternatives – 11×17 (West) (PDF)
- Map of Pierre Area Project Alternatives – 11×17 (East) (PDF)
- Map of Selby Area Project Alternatives – 11×17 (PDF)
Public Scoping Meeting Display Board, August 2007
- Generation Facility Operations (PDF 185 KB)
- Land and Easement Acquisitions (PDF 887 KB)
- NEPA Process (PDF 214 KB)
- NextGen Project Alternatives (PDF 1.8 MB)
- Project Overview (PDF 2.8 MB)
Public Scoping Meeting Handout, August 2007
Last modified on November 27th, 2024