Pick-Sloan Missouri Basin Program–Eastern Division
Rates Effective Date January 1, 2017 | |
P-SMPB–ED Composite Rate | 28.25 mills/kWh |
5 mill/kWh Rate Reduction
Base | Reduced Drought Adder | 2017 Total Charge | |
Firm Demand | $4.90 /kW-mo | $1.60 /kW-mo | $6.50 /kW-mo |
Firm Energy | 12.33 m/kWh | 3.85 m/kWh | 16.18 m/kWh |
Firm Peaking Demand | $4.45 /kW-mo | $1.40 /kW-mo | $5.85 /kW-mo |
Firm Peaking Energy 1/ | 12.33 m/kWh | 3.85 m/kWh | 16.18 m/kWh |
1/ Firm Peaking Energy is normally returned. This rate will be assessed in the event Firm Peaking Energy is not returned.
-
Drought Adder Modification Firm Power Service (PDF)
- Drought Adder Modification Firm Peaking Power Service (PDF)
Last modified on November 5th, 2024