Upper Great Plains Categorical Exclusions (CX)
CX 2025
- Nemont Fiber at Wolf Point Substation CX (PDF), June 4, 2025
- B4.3 Rate Extension RO WAPA-218 CX (PDF), March 19, 2025
CX 2024
- Rate Extension Rate Order No. WAPA-217 CX (PDF), September 27, 2024
- Rate Order No. WAPA-213 Drought Adder and Base Components Increases for 2025 and 2026 CX (PDF), August 30, 2024
- 2024 UGP Blanket CX (PDF), July 12, 2024
- Letcher Stage 03 CX (PDF), August 9, 2024
- WTS-WTBM Fiber Optic Cable Replacement CX (PDF), July 30, 2024
- 2024 UGP Blanket CX (PDF), July 12, 2024
- HE-DV Underground Fiber CX (PDF), June 14, 2024
- OTP-Forman Fiber/Conduit Installation CX (PDF), June 14, 2024
- OA-GH 230kV Line Upgrade (PDF), June 14, 2024
- Toronto Tap Switchyard Construction CX (PDF)
- US HWY 85 Final Phases CX_1 (PDF)
- Faith-Eagle Butte 115kV CX (PDF)
CX 2023
- CX B4.13 ED-FO Perm Reroute (PDF)
- CX B4.11 Eagle Butte Substation Expansion (PDF)
- CX B4.12 ED-FO Temp Reroute (PDF)
- 2023 UGP Blanket CX final (PDF)
- B4.11 CX Freedom Raider Sub SD 20230818 (PDF)
- Signed CX B1.15 B1.23 B4.11 Devil’s Lake Crew Bldg (PDF)
- Moorhead-Appr-Structures-CX-SIGNED-20231006 (PDF)
CX Archive
Last modified on June 12th, 2025