CAMPBELL COUNTY WIND FARM 2

​​Campbell County Wind Farm 2, LLC proposes to construct the Campbell County Wind Farm 2 Project (Project) in Campbell County, South Dakota.  The Project would generate up to 98.9 mega-watts and would interconnect to WAPA’s Bismarck to Glenham 230 kilo-volt transmission line at the existing Campbell County switchyard.

WAPA’S INVOLVEMENT

If there is available transmission capacity on the federal transmission system, WAPA provides open access to transmission services so that energy producers can transmit power to their customers.  Any entity requesting transmission services must submit an application for interconnection.  For more information about the interconnection process, visit WAPA’s website here​. The federal interconnection process is separate​ from any State, County, or local permitting and approvals that may be required.

​The proposed interconnection of the Project to WAPA’s transmission​ system is a Federal action under NEPA.  As a result, an Environmental Assessment (EA) will be prepared to evaluate the environmental effects of the Project.  The EA will tier from the analysis conducted in the Upper Great Plains Wind Energy Final Programmatic Environmental Impact Statement (PEIS).  The PEIS can be viewed here​. If WAPA finds there are no significant environmental impacts, the interconnection request will be granted and WAPA will prepare a Finding of No Significant Impact.  Together, the EA and the PEIS would comprise​ the NEPA documentation for this proposed Federal action.  ​If significant impacts are identified, the Environmental Impact Statement (EIS) process would be initiated.  An EIS provides a more thorough evaluation of impacts and alternatives, as well as a more formal public involvement process.

PUBLIC INVOLVEMENT

One of the first steps in the NEPA process is public scoping.  During the scoping process, input is requested from the general public, government agencies, tribal governments, and others to identify issues and alternatives that will help WAPA define the scope of the EA.

WAPA is announcing the public scoping period for the project.  A virtual scoping meeting was held on Wednesday, November 2, 2022 from 6:30 to 8:00 pm CST.

Comments may be submitted by:

Email to NEPA@wapa.gov

Hard-copy letter to

Western Area Power Administration

6th Floor Attn: Mr. John Russell

2900 4th Avenue North

Billings, MT 59101-1266

Phone to (605) 782-8199

Written comments should be postmarked no later than December 2, 2022.

The next step in the NEPA process will be to prepare a draft EA to analyze environmental impacts of the proposal.  Once prepared, a draft of the EA will be available for public review and comment.  ​​If you wish to be notified when the draft EA is available, please contact WAPA using one of the methods listed.

PROJECT LINKS

CONTACT INFORMATION

Western Area Power Administration

UGP NEPA Coordinator

2900 4th Avenue North

Billings, MT 59101-1266

(406) 255-2810

nepa@wapa.gov

 

Last modified on August 7th, 2023