wdt_ID Date Added Type
54 2022-039 Poncha-Canon West (PON-CCW) 230-kV Trans Line Veg Mngmt 01222024 pdf
55 2023-081 Badwater-Buffalo Head structure footing repair 01222024 pdf
56 2023-073 Ralston Substation Mobile Transformer Installation 01222024 pdf
57 2024-018 KIC-FMW, FMW-BC, BC-STG, and STG-WHK veg handwork CX 02022024 pdf
58 2024-019 Gering-McGrew and Bayard Tap-Bayard Distribution Line Vegetation Management CX 02022024 pdf
59 2024-021 Erie-Hoyt Handwork CX 02022024 pdf
60 2024-024 Goshen Area Danger Tree Hand Work CX 02022024 pdf
61 2022-049 Lovell-North Cody OPGW installation CX 02022024 pdf
62 2022-087 Pine Bluffs Substation Upgrades and Mobile Transformer Installation CX 02092024 pdf
63 2024-017 Cheyenne-Snowy Range Static line replacement CX 02022024 pdf
64 2024-022 MM-PLAP MM-S K-MM MM-SNG KOT-K S-SEM Trans Line Veg Mngmt (Hand) VM24-006_CX_02082024 pdf
65 2024-023 2024-023 LRT-GLD, GLD-GLD, GLD-GSL, GLD-WRK-N&S, GWT-LIM, WRK-LIM Hand Veg VM24-009 _CX pdf
66 2024-026 Western Colorado Maintenance Office Communication Site and Facility Herbicide Treatment pdf
67 2024-005 Ault Substation Reactor Replacement and Windsor and Hygiene Tap Switch Replacement CX 02262024 pdf
68 2024-020 Shiprock Substation Access Road Maintenance CX 03012024signed pdf
69 2021-088 Rate Change Extension CX-WAPA-197-03262024 pdf
70 2024-028 Sterling-Sidney anchor replacement CX 03272024 pdf
71 2024-027 Sterling-Sidney emergency guy wire replacement CX 03272024 pdf
72 2024-031 Cheyenne-Snowy Range Emergency Structure Replacement CX 03272024 pdf
73 2024-009 Alcova-Casper N and S ROW Expansion CX 04172024 pdf
74 2023-025 Glendo-Podolak Structure Replacement CX 05312024 pdf
75 2024-042 Sterling-Sidney Structure Replacement CX 05212024 pdf
76 2024-043 Sterling-Sidney Emergency Structure Replacement CX 05212024 pdf
77 2023-082 Four Corners Microwave Bldg Replacement CX 06062024 pdf
78 2024-029 Boysen-Pilot Butte Structure Replacement CX 06182024 pdf
79 2024-046 Gering Area Emergency Structure Replacement CX 06182024 pdf
80 2023-067 Craig-Rifle T-Line Veg Mgmt CX 06242024 pdf
81 2021-102 Gore Pass-Kremmling T-Line Structure Replace and ROW Maint CX 06252024 pdf
82 2023-068 Craig-Hayden 1 Veg Mechanical CX 07082024 pdf
83 2024-069 HDN-VNL Transmission Line Structure Replacements CX 07112024 pdf
84 2021-043-Thermopolis-Lovell-Mechanical-Veg pdf
85 2023-053-F-VAL-Structure-Replacement pdf
86 2024-001-Ault-Craig-and-Terry-North-Park-Hand-Work-Veg pdf
87 2024-056-Mary-Lake-East-Portal-Veg-Handwork pdf
88 2024-057-Cody-Area-Veg-Management-Hand-Work pdf
89 2024-076-Kimball-Sidney-Structure-Relocation pdf
91 2024-054-VM2-119-SHR-FCO-SHR-SUB-FCO-SUB-HANDWORK-VEG pdf
92 2024-055 LCN SUB -SHR SUB Handwork Veg Management pdf
93 2022-037 NFK-RFL VEG MGMNT MACHINE_CX pdf
94 2024-077 CX Alcova-Casper NS Access Roads and Landings pdf
95 2024-030-PON-Emergency-Cable-Repair-CX pdf
96 2024-044-Windy-Gap-Granby-Pumping-Plant-CX pdf
97 2023-027 ERA MAP pdf
98 2023-027 CCI-MP-2 ADSS Replacement CX pdf

Last modified on January 23rd, 2024