DEER CREEK STATION ENERGY FACILITY PROJECT
Basin Electric proposes to construct, own, operate, and maintain the Deer Creek Station Energy Facility Project, a 300-MW, combined-cycle, natural gas generation facility, water pipeline, transmission lines, transmission interconnection(s), and other associated facilities, all in Brookings and Deuel counties in eastern South Dakota. The purpose of the proposed Project is to help serve increased load demand for electric power in the eastern portion of Basin Electric’s service area. The need for additional generating capacity is driven by the increasing electrical power usage of the Basin Electric membership consumers.
Basin Electric has requested interconnection with WAPA’s electric transmission system at White Substation, located in Brookings County, South Dakota.
RECORD OF DECISION ISSUED
WAPA has approved the interconnection of a new gas-fired, electric generation facility located at White Site 1, about six miles southeast of White, S.D., to its transmission system. WAPA will make the necessary modifications for the interconnection to its existing White Substation.
Basin Electric has committed to minimize its proposed project’s impact on the environment through the project’s design, the use of pollution control technology and the implementation of mitigation measures identified in the Record of Decision.
PROJECT UPDATES AND DOCUMENTS
- Record of Decision (883 kb pdf)
- News release announcing Record of Decision, June 30, 2010
- Draft Environmental Impact Statement (complete) (16.9 MB pdf)
- Cover and Table of Contents (357 kb pdf)
- Executive Summary (238 kb pdf)
- Chapter 1 – Introduction (928 kb pdf)
- Chapter 2 – Proposed Action and Alternatives (3.9 MB pdf)
- Chapter 3 – Affected Environment (2.4 MB pdf)
- Chapter 4 – Environmental Consequences (6.7 MB pdf)
- Chapter 5 – List of Agencies, Organizations and Persons receiving the DEIS (323 kb pdf)
- Chapter 6 – List of Preparers (235 kb pdf)
- Chapter 7 – Literature Cited (197 kb pdf)
- Chapter 8 – Index (190 kb pdf)
- Appendix A – Final Scoping Report Summary (1.5 MB pdf)
- Appendix B – Wetland Delineation Maps (2.4 MB pdf)
- Appendix C – Partial Listing of Wildlife Observed or Known to Occur (168 kb pdf)
- Appendix D – Fish Species Known or Likely to Occur (162 kb pdf)
- Appendix E – Special Status Species Habitat Descriptions (179 kb pdf)
- Appendix F – Standard Mitigation Measures (187 kb pdf)
- Appendix G – Construction Diagrams for Trenching/Drilling (209 kb pdf)
Notice of Intent to Prepare an Environmental Impact Statement (54 kb pdf)
Project description (3.8 MB pdf)
Feb. 24, 2009, scoping meeting advertisement (734 kb pdf)
SCOPING MEETING MATERIALS
- Environmental resources poster (466 kb pdf)
- Generation facility operations poster (200 kb pdf)
- Land and easement acquisitions poster (399 db pdf)
- NEPA process poster (795 kb pdf)
- Project alternatives poster 872 kb pdf)
- Project overview poster (260 kb pdf)
Last modified on May 6th, 2024