Footnotes

  1. Does not include the Lower Colorado River Basin Development Fund (LCRBDF) surcharge of .45 cents/kWh for AZ power customers and .25 cents/kWh for CA and NV power customers. BCP is a generation only project with no associated transmission.
  2. Effective rate per revenue requirement, varies annually with generation levels. Does not include Restoration Fund charge.
  3. Includes the drought adder component of the rate between FY08-17.
  4. Does not include LCRBDF surcharge of .45 cents/kWh for AZ power customers and .25 cents/kWh for NV and CA power customers.
  5. Beginning Oct. 1, 2015, UGP joined SPP and operates under the SPP Tarriff. Therefore, UGP no longer has a transmission “rate” only an Annual Revenue Requirement that gets applied in the SPP UMZ.

 

TheNumbers

wdt_ID Title 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Category
1 Boulder Canyon Project 1/ 1.764 1.862 1.893 1.973 2.112 2.128 2.018 1.628 1.833 1.963 Power Rate (cents/kWh)
2 Central Arizona Project 2/ N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Power Rate (cents/kWh)
3 Central Valley Project *effective rate per revenue requirement, varies annually with generation levels 2.850 2.989 3.176 1.985 2.144 2.290 3.184 3.726 3.001 1.791 Power Rate (cents/kWh)
4 Falcon-Amistad Project Power Rate (cents/kWh)
5 Loveland Area Projects 3/ 3.242 3.724 4.142 4.142 4.142 4.142 4.142 4.142 4.142 3.656 Power Rate (cents/kWh)
6 Pacific NW-SW Intertie N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Power Rate (cents/kWh)
7 Parker-Davis Project 4/ 0.911 0.911 1.095 1.095 1.095 1.131 1.140 1.236 1.325 1.430 Power Rate (cents/kWh)
8 Pick-Sloan Missouri Basin Program - Eastern Division 3/ 2.449 2.934 3.325 3.325 3.325 3.325 3.325 3.325 3.325 2.825 Power Rate (cents/kWh)
9 Provo River Project Power Rate (cents/kWh)
10 Salt Lake City Area/Integrated Projects 2.528 2.680 2.962 2.962 2.962 2.962 2.962 2.962 2.942 2.942 Power Rate (cents/kWh)
Category

Last modified on September 25th, 2023