ROCKY MOUNTAIN REGION
OPEN ACCESS

TRANSMISSION AND ANCILLARY SERVICES*

The following rates are effective October 1, 2012 – September 30, 2013

TARIFF RATES 2013

Tariff Schedule Number/Title/Rate Schedule Number Rate *
-Attachment H-Annual Transmission Revenue Requirement for Network Integration Transmission Service (L-NT1) Load Ratio Share of 1/12 of the Revenue Requirement: $61,324,070
-7-Long-Term Firm and Short-Term Firm Point-to-Point Transmission Service (L-FPT1) $45.84/kW-year
$3.82/kW-month
$0.88/kW-week
$0.13/kW-day
-8-Non-Firm Point-to-Point Transmission Service (L-NFPT1) Market, NTE:
$3.82/kW-month
$0.88/kW-week
$0.13/kW-day
5.23 mills/kWh
Transmission Losses Service (L-AS7) 5% Loss Rate effectvie 12/1/2012 - 9/30/2013
4.5% Loss Rate effective 10/1/2012 - 11/30/2012.
Transmission customers may settle financially or with energy. Pricing for this service will be WACM weighted average hourly purchase price.
-10-Unreserved Use Penalties (L-UU1) Penalized 200% of LAP's firm point-to-point rate, with a maximum of monthly service and a minimum of daily service.
-1-Scheduling, System Control, and Dispatch Service (L-AS1) $17.71 per schedule per day
-2-Reactive Supply and Voltage Control from Generation or Other Sources Service (L-AS2) $0.355/kW-month
$0.082/kW-week
$0.012/kW-day
0.487 mills/kWh
-3-Regulation and Frequency Response Service (L-AS3) $0.282/kW-month
$0.065/kW-week
$0.009/kW-day
0.375 mills/kWh
-4-Energy Imbalance Service (L-AS4) -Imbalances less than or equal to 1.5% (minimum 4MW) of metered load settled using WACM hourly pricing with no penalty.
-Imbalances between 1.5% and 7.5% (minimum 4MW to 10 MW) of metered load settled using WACM hourly pricing with a 10% penalty.
-Imbalances greater that 7.5% (minimum 10 MW) of metered load settled using WACM hourly pricing with a 25% penalty.
-WACM aggregate imbalance determines pricing in all bands
--aggregate surplus dictates sale pricing, aggregate deficit dictates purchase pricing.
-5-Operating Reserve - Spinning Reserve Service (L-AS5) Long-term reserves are not available from WACM. Reserves may be provided at pass-through cost, plus an amount for administration.
-6-Operating Reserve - Supplemental Reserve Service (L-AS6) Long-term reserves are not available from WACM. Reserves may be provided at pass-through cost, plus an amount for administration.
-9-Generator Imbalance Service (L-AS9) -Imbalances less than or equal to 1.5% (minimum 4MW) of metered generation settled using WACM hourly pricing with no penalty.
-Imbalances between 1.5% and 7.5% (minimum 4MW to 10 MW) of metered generation settled using WACM hourly pricing with a 10% penalty.
-Imbalances greater that 7.5% (minimum 10MW) of metered generation settled using WACM hourly pricing with a 25% penalty.
- Intermittent resources not subject to 25% penalty.
-WACM aggregate imbalance determines pricing in all bands
--aggregate surplus dictates sale pricing, aggregate deficit dictates purchase pricing

Last modified on July 27th, 2023