Desert Southwest Region Consolidated Rates Schedule – FY 2025

One Transmission Rate (OTR)

Parker-Davis Project
Intertie Project
Central Arizona Project
Electrical District No. 5-Palo Verde Hub Project
Schedule Description Rates Effective Date
DSW-FT1 (PDF) Long-Term and Short-Term Firm Point-to-Point Transmission Service (Schedule 7 to OATT)
$21.12/kW-Year
$1.76/kW-Month
$0.41/kW-Week
$0.06/kW-Day
2.41 mills/kWh
10/1/2024
DSW-NFT1 (PDF) Nonfirm Transmission Service
(Schedule 8 to OATT)
2.41 mills/kWh 10/1/2024
DSW-NTS1 (PDF) Network Integration Transmission Service
Annual Transmission Revenue Requirement
(Attachment H to OATT)
$105,251,766 10/1/2024
DSW-TL1 (PDF) Transmission Losses 3.00% 10/1/2021
DSW-UUI (PDF) Unreserved Use Penalties
(Schedule 10 to OATT)
See Rate Schedule 10/1/2021

Point of Contact: Tina Ramsey


Parker Davis Project

Schedule Description Rates Effective Date
PD-F8 (PDF) Firm Electric Service 10/1/2024
Energy Charge 13.14 mills/kWh
Capacity Charge $5.76 kW-Month
Composite 26.27 mills/kWh
LCRBDF Contribution Charge
4.50 mills /kWh (AZ)
2.50 mills/kWh (CA/NV)
For Transmission Service, see OTR Section
DSW-FCT8 (PDF) Transmission Service of SLCA/IP Power $1.76 /kW-Month 10/1/2024
DSW-TL1 (PDF) Transmission Losses 3.00% 10/1/2021
DSW-UUI (PDF) Unreserved Use Penalties
(Schedule 10 to OATT)
See Rate Schedule 10/1/2021

Point of Contact: Shannon Joya


Boulder Canyon Project

Schedule Description Rates Effective Date
BCP-F11 (PDF)
Base Charge $74,334,285 10/1/2024
Energy Dollars $37,167,143
Capacity Dollars $37,167,143
Forecast Energy Rate 12.20 mills/kWh
Applied to Excess Energy, Unauthorized Overruns and Water Pump Energy
Forecast Energy Rate $2.17/kW-month 10/1/2024
Applied to Unauthorized Overruns
Calculated Energy Rate
Calculated within 90 days after the end of each fiscal year. If the Energy Deemed Delivered is greater than 4,501 MWh, then the Calculated Rate shall be applied to each Contractor’s Energy Deemed Delivered. A credit or debit shall be established based on the difference between the Contractor’s Energy Dollar and the Contractor’s Actual Energy Charge.
Composite 24.39 mills/kWh 10/1/2024
LCRBDF Contribution Charge
4.50 mills /kWh (AZ)
2.50 mills/kWh (CA/NV)
10/1/2024

Point of Contact: Christina Maldonado


WALC BA Ancillary Services

Schedule Description Rates Effective Date
DSW-SD4 (PDF) Scheduling, System Control & Dispatch
(Schedule 1 to OATT)
$14.57 /schedule per day 10/1/2024
DSW-RS4 (PDF) Reactive Supply and Voltage Control
(Schedule 2 to OATT)
$0.069 /kW-Month 10/1/2024
DSW-FR4 (PDF) Regulation and Frequency Response
(Schedule 3 to OATT)
$0.102 /kW-Month 10/1/2024
DSW-SPR4 (PDF) Spinning Reserves
(Schedule 5 to OATT)
None available1 10/1/2024
DSW-SUR4 (PDF) Spinning Reserves
(Schedule 6 to OATT)
1Upon request, WALC will purchase at market price and pass-through the cost-plus administrative fee.

Western Energy Imbalance Market

DSW-EIM1T (PDF) Administrative Service
(Schedule 1T to OATT)
Pass Through2 4/5/2023
DSW-EIM4T (PDF) Energy Imbalance Service
(Schedule 4T to OATT)
Pass Through2 4/5/2023
DSW-EIM9T (PDF) Generator Imbalance Service
(Schedule 9T to OATT)
Pass Through2 4/5/2023
2Charges shall reflect the pass through of all applicable costs associated with the WALC BA’s participation in the EIM.

Point of Contact: Tina Ramsey