Rates Loveland Area Project Firm Power Rates Transmission and Ancillary Services Rates 2012 Rate Adjustment-Transmission and Ancillary Services 2010 Rate Adjustment-Firm Power 2009 Rate Extension-Transmission and Ancillary Services 2009 Rate Adjustment-Firm Power 2008 Rate Adjustment-Firm Power 2006 Rate Adjustments
2005 Rate Adjustments
2004 Rate Adjustments Rate Process Science Bowl |
ROCKY MOUNTAIN REGION
|
Tariff Schedule Number/ |
Rate * |
|---|---|
| -Attachment H-Annual Transmission Revenue Requirement for Network Integration Transmission Service (L-NT1) | Load Ratio Share of 1/12 of the Revenue Requirement: $61,324,070 |
| -7-Long-Term Firm and Short-Term Firm Point-to-Point Transmission Service (L-FPT1) | $45.84/kW-year $3.82/kW-month $0.88/kW-week $0.13/kW-day |
| -8-Non-Firm Point-to-Point Transmission Service (L-NFPT1) | Market, NTE: |
| Transmission Losses Service (L-AS7) | 5% Loss Rate effectvie 12/1/2012 - 9/30/2013. 4.5% Loss Rate effective 10/1/2012 - 11/30/2012. Transmission customers may settle financially or with energy. Pricing for this service will be WACM weighted average hourly purchase price. |
| -10-Unreserved Use Penalties (L-UU1) | Penalized 200% of LAP's firm point-to-point rate, with a maximum of monthly service and a minimum of daily service. |
| -1-Scheduling, System Control, and Dispatch Service (L-AS1) | $17.71 per schedule per day |
| -2-Reactive Supply and Voltage Control from Generation or Other Sources Service (L-AS2) | $0.355/kW-month $0.082/kW-week $0.012/kW-day 0.487 mills/kWh |
| $0.282/kW-month $0.065/kW-week $0.009/kW-day 0.375 mills/kWh |
|
| -4-Energy Imbalance Service (L-AS4) | -Imbalances less than or equal to 1.5% (minimum 4MW) of metered load settled using WACM hourly pricing with no penalty. -Imbalances between 1.5% and 7.5% (minimum 4MW to 10 MW) of metered load settled using WACM hourly pricing with a 10% penalty. -Imbalances greater that 7.5% (minimum 10 MW) of metered load settled using WACM hourly pricing with a 25% penalty. -WACM aggregate imbalance determines pricing in all bands--aggregate surplus dictates sale pricing, aggregate deficit dictates purchase pricing. |
| -5-Operating Reserve - Spinning Reserve Service (L-AS5) | Long-term reserves are not available from WACM. Reserves may be provided at pass-through cost, plus an amount for administration. |
| -6-Operating Reserve - Supplemental Reserve Service (L-AS6) | Long-term reserves are not available from WACM. Reserves may be provided at pass-through cost, plus an amount for administration. |
| -9-Generator Imbalance Service (L-AS9) | -Imbalances less than or equal to 1.5% (minimum 4MW) of metered generation settled using WACM hourly pricing with no penalty. -Imbalances between 1.5% and 7.5% (minimum 4MW to 10 MW) of metered generation settled using WACM hourly pricing with a 10% penalty. -Imbalances greater that 7.5% (minimum 10MW) of metered generation settled using WACM hourly pricing with a 25% penalty. - Intermittent resources not subject to 25% penalty. -WACM aggregate imbalance determines pricing in all bands--aggregate surplus dictates sale pricing, aggregate deficit dictates purchase pricing. |