|
Rate Schedule SP-FR2
(Supersedes Schedule SP-FR1)
UNITED STATES DEPARTMENT OF ENERGY
Western Area Power Administration
Colorado River Storage Project
Arizona, Colorado, New Mexico, Nevada, Utah
SCHEDULE OF RATES FOR REGULATION AND
FREQUENCY RESPONSE ANCILLARY SERVICE
- Effective:
- Beginning on October 1, 2002, and extending through September 30, 2010.
- Available:
- In the area served by the Colorado River Storage Project (CRSP) transmission system.
- Applicable:
- To all CRSP transmission customers receiving this service.
- Character of Service:
- Necessary to provide for the continuous balancing of resources, generation and interchange, with load and for maintaining scheduled interconnection frequency at sixty cycles per second (60 Hz).
- Rate:
- If the CRSP MC has regulation available for sale, the SLCA/IP firm power capacity rate, currently in effect, will be charged. If regulation is unavailable from SLCA/IP resources, the WALC or WACM control areas can provide the service, in accordance with their respective rate schedules.
Updated:
October 3, 2007
|