Rate Schedule SP-NFT5 (Supersedes Schedule
SP-NFT4) UNITED STATES DEPARTMENT OF ENERGY Western Area Power
Administration Colorado River Storage Project Arizona, Colorado, New
Mexico, Nevada, Utah SCHEDULE OF RATE FOR NONFIRM POINT-TO-POINT
TRANSMISSION SERVICE
- Effective:
- The first day of the first full billing period beginning on or
after October 1, 2002, and extending through September 30, 2007, or until
superseded by another rate schedule, whichever occurs earlier.
- Available:
- In the area served by the Colorado River Storage Project (CRSP)
transmission system.
- Applicable:
- To non-firm, point-to-point, transmission service customers for
which power and energy are supplied to the CRSP transmission system at points
of interconnection with other systems and transmitted and delivered, less
losses, to points of delivery on the CRSP transmission system established by
contract.
- Character and Conditions of Service:
- Transmission service on an interruptible basis for three-phase
alternating current at 60 hertz, delivered and metered at the voltages and
points of delivery specified in the service contract or in advance by the
Western Area Power Administration (Western). Conditions for curtailment shall
be determined by Western and in accordance with Westerns Tariff.
- Rate:
- The proposed rate for non-firm
point-to-point CRSP transmission service is based upon the firm point-to-point
rate expressed in mills/kWh. This rate may be discounted.
- Billing:
- The rate will be applied to each kWh delivered at the point of
delivery, as specified in the service contract.
- Adjustments for Reactive Power:
- None. There shall be no entitlement to transfer of reactive
kilovolt-amperes at delivery points, except when such transfers may be mutually
agreed upon by the Contractor and the contracting officer or their authorized
representatives.
- Adjustments for Losses:
- Power and energy losses incurred in connection with the
transmission and delivery of power and energy under this rate schedule shall be
supplied by the customer in accordance with the service contract. If losses are
not fully provided by a transmission customer, charges for financial
compensation may apply.
- Adjustment for Industry Restructuring:
- Any transmission-related costs incurred by Western due to
electric industry restructuring or other industry changes associated with
providing CRSP transmission service will be passed through to each transmission
customer, as appropriate.
Updated: 2/8/2005 |