Rate Schedule SP-FR2 (Supersedes Schedule
SP-FR1) UNITED STATES DEPARTMENT OF ENERGY Western Area Power
Administration Colorado River Storage Project Arizona, Colorado, New
Mexico, Nevada, Utah SCHEDULE OF RATES FOR REGULATION AND FREQUENCY
RESPONSE ANCILLARY SERVICE
- Effective:
- Beginning on October 1, 2002, and extending through September
30, 2007.
- Available:
- In the area served by the Colorado River Storage Project (CRSP)
transmission system.
- Applicable:
- To all CRSP transmission customers receiving this service.
- Character of
Service:
- Necessary to provide for the continuous balancing of resources,
generation and interchange, with load and for maintaining scheduled
interconnection frequency at sixty cycles per second (60 Hz).
- Rate:
- If the CRSP MC has regulation available for sale, the SLCA/IP
firm power capacity rate, currently in effect, will be charged. If regulation
is unavailable from SLCA/IP resources, the WALC or WACM control areas can
provide the service, in accordance with their respective rate schedules.
Updated: 2/8/2005 |