Firm Rates
The Pick-Sloan Missouri Basin Program--Eastern Division Rate Order No. WAPA-135 was published November 14, 2007. The Rate Order contains the firm power and firm peaking power service rates which will be effective January 1, 2008. A summary of the rates are shown in the table below.
|
Firm Electric Service |
Pick Sloan Missouri River-Eastern Division
Rates Effective
January 1, 2008 |
| P-SMPB--ED Firm and Firm Peaking Revenue Requirement
|
$235.9 million |
| P-SMPB--ED Composit Rate |
24.49 mills/kWh |
| Firm Demand |
$5.65/kWmo |
| Firm Energy |
13.99 mills/kWh |
| Tiered > 60 Percent Load Factor |
Eliminated |
| Firm Peaking Demand |
$5.10/kWmo |
| Firm Peaking Energy 1/ |
13.99 mills/kWh |
1/ Firm Peaking Energy is normally returned. This rate will be assessed in the event Firm Peaking Energy is not returned.
|
|